Project Scope
The upgrades would include ditch grading with revised elevations to efficiently carry storm water to mitigate flooding conditions during peak flows. This will help in resolving significant water pooling and surcharge issue in SW and NE quadrants of the Town. The project would also carry out repair works to the three existing storm gates along the creek (behind the hospital) to ease its operation along with installation of check valves in the storm outfalls to limit backflows in our system during peak season.